FY27 capex hardened to INR15,000cr then INR18-19,000cr FY28 with 3-plant program (IISCO+Bhilai+Bokaro).
- Cumulative vs ytd railway — question deflected.
- Pay commission timing brownfield — answer hedged.
- Peak capex year quantum — answer hedged.
My first question pertains to this -- that incentive, which -- the railway price revision, which you mentioned as a footnote. So the contract number, the revenue contract numbers, what do the cumulative and the YTD numbers mean? Because they don't add up. Sir, the railway -- the supply for railway, government entities, so far in Q4 you have mentioned INR2,073 crores. And if I look at the YTD number in March, that is INR9,496 crores. But if I add up the 4 quarterly numbers, they total up to a much higher number of more than INR10,000 crores, almost INR11,000 crores, while the reported number is INR9,500 crores for full year.
This is regarding which figure, if you can clarify? Actually, can you give the numbers? Just to clarify -- can you hear me? Just to clarify, this includes railways as well as other than railways, like defence and others. So the figures will not exactly add up -- these figures may not exactly add up to that number. This includes railways... What we can do is we can take this question and clarify you, okay? Cumulative for the year. Cumulative is till date actually, till date. Till March '25. Since all these years, till March '25. We will take this -- we can take this specific question, and I'll give you the answer for better clarity.
Okay. And my second question is just extending the discussion on employee cost. Two things, sir. One, when is the pay commission impact would come in once the federal government finalizes it for us? And second, given that we are doing a lot of brownfield expansion going ahead, is it safe to assume that the bulk of the employees, which are -- who are already working in those sites would be shared with the new capex -- new capacity coming in? And hence, the cost structure of the new capacity would be significantly better than what we are seeing right now because employee cost has been kind of an Achilles heel for us. So safe to assume that the new capacities will be more efficient from an employee cost perspective? And on the pay revision timeline, sir? CY '27, right? or FY?
You're absolutely correct, actually, because we are planning right now for a brownfield as well as greenfield expansion, which are going to come in the next 3, 4, 5 years. And in the -- during that time, the employee cost would have come down significantly through normal separation and a little bit of induction of fresh blood. So at that point of time, we'll find that all these new facilities, they will be having less manning and more automation and AI-related applications. So they'll be very, very efficient in terms of manpower cost. Today, we can see our new plant, which is IISCO Steel Plant, where the manpower cost is pretty less as compared to rest of the other legacy plants. So going forward, all these major facilities, which will be coming in, all the units, they will have more efficient manpower cost structure in those facilities. Pay revision, as you know, actually, it happens every 10 years. So next is due in 2027. So we'll look into that whenever it comes, any guidance, et cetera. I mean that is slated for 2027, CY '27. So then only we'll come to know about it.
Okay. And what will be the peak capex? You mentioned -- you've given guidance on '26 capex, but you said that in '27, the capex will peak. So what quantum will be that? And what will be that, any -- if you can quantify that?
No, in '27, it may not be peak. Today let me try to answer it. Because this year, we have given a capex of INR7,500 crores, and slowly and slowly as the projects take up, so the payments will start. And based on the milestone payments, the capex is going to increase. So this peak level of -- this capex may happen sometime around maybe -- just 1 sec, could be somewhere around '28, '29, like that. That we have to see actually from -- I mean, anybody can guess the number with respect to capacities, but then it will increase quite a lot. If it is INR7,500 crores today, so it may increase by around INR10,000 crores, INR15,000 crores, something like that. At that point of time, we need to quantify because these are very dynamic kind of a thing, and depending on how the projects take up and then the kind of milestones they have, based on that the capex plans are done.
Yes. Thank you, everyone, for attending the call. And on behalf of Nuvama, we really thank the management to give us the opportunity to hold this call. Sir, lastly, if I had to sum up what you have discussed in this call, is it safe to assume that we are expecting something like INR3,000 price increase in quarter 1 FY '26 over FY '25 Q4 along with INR700, INR800 /t decline in coking coal cost and lower employee costs also, which was somewhat higher this quarter?
Let me sum up and tell you actually, so far as imported coal price is concerned, we expect that it is almost kind of stable. So that reduction may continue, number one. Number two, so far as sales price is concerned, although it appears to be INR3,000 or INR2,000 as compared to quarter 4, but it is market driven. It is market driven. So it will be up and down as compared to that. And more so because the monsoon is going to come. So during that time, it will remain a little subdued. And after that, we expect better improvement in that. And the third question was about employee costs. Yes, employee cost, as I told you with certainty that because of the natural separations, that is going to come down.
Thanks for the opportunity and congratulations on a great set of numbers. My first question is on the expansion plans, if you could indicate a timeline when we are going to start spending capex. And on the same question, have you secured Board and government approval for the expansion plan?
Yes. Mr. Amit, we have got an expansion plan. Right now, we are at around 20 million tons of capacity, and we want to go towards 35 million tons of capacity by 2030. So these are focused on various units to start with. We started doing the tendering activities in ISP, IISCO Steel Plant, followed by other plants. Other plants -- it will follow in other plants as well. So that is the kind of plan we have. And for that, we are lining up our investments, et cetera, for that as well. And the capex, we are going to increase the capex. And in stages, we'll be taking approvals. Approvals are coming from SAIL Board, et cetera.
Sir, in terms of timeline, when are we going to start the first, say, round of capex on this? And my second question, again on capex, if you could provide a specific guidance for FY '26 for capex?
Yes. The first -- as I've said now, the capex will take place in stages. And since it has already taken off in ISP, which is IISCO Steel Plant, the tendering process has started, et cetera, so some initial payments have been started over there. And as we go ahead, once the packages are tendered out and the activity starts, then the chunk of investments will come from the next year. I mean, some chunk will come in '25-'26. From '26-'27 onwards, major chunks will start coming in terms of capex. We have decided INR7,500 crores capex for '25-'26.
On the volumes that you did in Q4, so could you help understand what was the mix of the volume in terms of finished, semi-finished? And in sales? Sales volume mix, I mean. And the breakup I meant. I have the volume. I wanted the breakup of finished.
Yes. In Q4, the Q4 total volume was 4.72, isn't it? Total saleable steel production volume was 4.72, out of which finished volume was 4.09 million tons in Q4. And in terms of sales? Sales volume? Sales volume was much more than this, just 1 sec, 5.33 million tons. 5.33, that's total. 5.33 is total, out of which the semifinished would be -- semifinished is around 0.48 or 0.5, you can take.
Okay. I was just wondering that realization for you was flat Q-o-Q, like generally, there was an improvement in steel realization across the board in the quarter. So I was just trying to understand like why the realization for you was flat. Quarter 4. Right now, quarter 4. So if you could give NSR for quarter 4. Yes, if you could give both of them.
Just 1 sec. So far as long products are concerned -- you're talking about flat products or long products or in totality? Like, for example, in case of long products, actually between quarter 3, quarter 4, there's not much of a change because in quarter 3, the NSR, which is net sales price, is around INR52,500 crore, which almost remains the same in quarter 4. While in case of flat products, there's been improvement. In quarter 3, the numbers were INR46,800 and which has improved to INR 47,300 in quarter 4 for flat products. So on the whole, on the average also, there is improvement around -- of around INR300 to INR400 per ton between quarter 3 and quarter 4.
Understood. Understood. And what would be the coking coal cost in the quarter? Sure. And guidances for the same, NSR and costs. And sir, just a follow-up, so NSR and costs, if you could give guidance as well.
Coking coal cost in the quarter, if I talk about imported coal cost, so between quarter 3 and quarter 4, there is a reduction of around INR1,500 because in quarter 3, it was average around INR20,000 per ton, which came down to INR18,500 in quarter 4. Yes. NSR, as I said, actually, there was a bit of improvement in NSR post this safeguard duty and other things. And because the demand is going to grow, there will be boost in the demand. So we believe there will be improvement in the NSR, maybe after monsoon or something like that. And regarding imported coal price, right now, it is almost kind of a stable kind of a thing. Probably it will continue at that level or maybe it will increase a little bit if not.
Sir, just continuing on the previous question. Sir, my first question is if you could share April, May average, what is the NSR for flat and long? We have fourth quarter. So for the first 2 months, if you could share that? And also on the coking coal front, what is the cost expectation for 1Q or for the first 2 months, whatever we have seen?
Right. So the answer to your question is that taking NSR, first of all, net sales price, for the long products, the NSR in April and May are almost like INR55,000 per ton. And so far as flat is concerned, there's improvement in the flat products post this safeguard duty and which is around INR0,500, INR50,600, INR50,700, like that. That's about the NSR front. In the imported coal prices, as you've asked, in the imported coal prices, the coal prices are almost hovering around INR17,000 to INR7,500 per ton.
Okay. So from fourth quarter, we are seeing almost in flat INR3,000 and in long INR4,000 increase, and in coking coal, we are seeing around INR1,500 reduction. Is that the right calculation?
I mean, as you said, in the imported coal side, there has been a reduction of around, say, INR1,000. And in the NSR front, it's not INR3,000, INR4,000 actually, as compared to quarter 4, in the long, there is around INR2,000 -- INR1,700 increase. And in the flat, it is around, say, INR3,000 -- INR2,500 to INR3,000, yes. So it varies between INR1,500 to INR3,000 between long and flat.
Okay. Sir, one question on employee cost, if you could guide what is our expectation? Last 2, 3 years, it's been very stagnant. So what is our expectation for '26-'27?
Yes. As we've been telling that, actually, our employee cost is coming down over the years because of the natural separations. So you can see on the absolute figures, the employee cost has come down in '24-'25 as compared to the previous year, and we are expecting a further reduction in the coming financial year, which is '25-'26 by at least INR400 to INR500 cr. This is our expectation.
Okay. And just one accounting clarification, sir. So for the full year, there was a railway provision for previous years of around INR650 -- sorry, INR687 crores. But then in the second quarter, we had shared some INR1,600 crores -- INR400 crores of rail price revision provision for FY '23. So just wanted to understand, for the full year '25, this INR650 crores is inclusive of that or we have to add the INR1,600 crores of the second quarter as well?
For the entire year, it will be -- INR625 crores is the figure for quarter 4. The net figure is INR625 crores, INR685 crores minus some other adjustment of INR61 crores is INR625 crores for quarter 4. And that is a part of the total figure of INR2,200 crores for the entire year.
Okay. And secondly, you've mentioned that you're looking to reduce your employee costs. But in Q4, there is a sharp jump on an employee cost number on a Q-on-Q basis by almost 20%. So what does this pertain to? And you mentioned that you're looking to reduce by INR400 crores to INR500 crores in FY '26.
Right. So let me answer this question. Actually in Q4, there has been a jump of around INR500 crores to INR600 crores, if I believe, as compared to the previous. The reasons are because of 2, 3 aspects. One is reduction in the discounting factor from 7.29% to 6.7-odd percentage. That has got an impact. And then the final pension provision, which was earlier 3%, it has been increased to 7.5% or something. So that has got an impact. And then, looking at the profitability, the incremental PRP, which is to be provided for the entire year and has been provided in quarter 4. So basically, pensions, PRP and then discounting factors. These are the 3 reasons for increase in salary wages in quarter 4. These are accounting adjustments taken in quarter 4 compared to previous quarter.
So just to clarify, this INR3,300 crores, it is only pertaining to all the adjustments pertaining to only Q4 or it is like full-year adjustments, let's say, reflected in the March quarter. And lastly, could you share on your -- thoughts on volumes -- yes, I'll just -- I'll complete my question and move out, on the -- guidance on the volume front for FY '26?
It is the full adjustment, which has been done in the March quarter, quarter 4. Yes, on a quarterly basis. Yes. In FY '26, we are looking forward to having more volume as compared to the previous year. If you are looking at the crude steel numbers, crude steel numbers were 19 million tons in '24-'25. We are looking at a number of around 20 or beyond in -- good numbers.
Sir, just wanted to understand that our semi sales at almost 14% still stays very high. So is there any chances that in the next year we could come down this? And out of the 19, 20 million tons of total production, what is your own sales target, sir?
Out of 19 million tons of crude steel production, our saleable steel production is actually 18.4, 18.5 million tons or, you can say, 18.5 million tons. So out of that, the semis will be around -- just 1 sec, around 2.75 million tons, which is roughly 15%.
So sir, my question was that next year when we are targeting 20 million tons of crude steel production, what would be our sales target? And can we bring down this 14 million, 15 million tons of semis or it will remain at that level?
So coming back to the question, actually, when we're targeting 20 million tons of crude steel, the saleable steel will be around 19.2 million, 19.3 million tons, and we are targeting sales of more than that. And within that, we are targeting semis of less than 14%. That means around 10% to 12% we are targeting because we are taking various other steps for that. And going forward, actually, the semi's will further come down because we're going to put up a new TMT bar mill at Durgapur steel plant, so which will come after 2.5 years. So at that time, you look at the semis, it will be almost kind of zero or very, very less, negligible.
Understood. Sir, my second question pertains to this INR7,500 crores capex plan, how much is towards the RM, especially the pelletization plant, if you could clarify that. And what is the stage of our pellet plant in terms of construction? Sir, Jharkhand inventory can be used in this pellet plant or those low-grade inventory would remain idle?
Yes. Coming back to the question actually, INR7,500 crores doesn't include the pellet plant because pellet plants are coming in the BOO -- on BOO basis. So the capex will be done by the BOO operator. So we'll be incurring only O&M cost after it is set up. So that is the answer to that question. Coming back to when they're going to come, they will be coming in stages. At Bhilai mines, it is going to start after a month, this month, May end, or June, some time, like that. And then the other ones, like in Rourkela and Durgapur, they are at the tendering stage, so it will take some time. It will take around 3 years -- up to 3 years' time, you can say. And there are other pellet plants also in the pipeline, for which we may give the go ahead signal for tendering. Yes. Coming to Jharkhand inventory of low grade, I can say, actually, we are planning a 4 million tons pellet plant at Goa itself, which will be consuming these low-grade as well as fresh fines in the ratio of 50%, 50% initially. So that pellet plant is geared up towards this.
Sir, first question was on the volumes. So this quarter, we've probably liquidated some inventory. But I also want to check that NMDC had mentioned that NMDC Steel is also having a marketing arrangement with SAIL. So any of this quarter volumes include some steel from NMDC Steel? So this 5.33 includes about 0.36 million tons of NMDC Steel. Is that correct, sir? Okay. Okay. So that would be mostly trading sales.
Yes. It includes steel from NMDC -- NSL, NMDC Steel Limited to the tune of around 3.6 lakh tons. Yes. Yes. That is kind of actually trading on some arrangement actually. So the stock is happening in our books. We will be taking from them. So there is some management for that, commercial management.
Sure. And this year, did we have any sale of iron ore fines, you were planning to sell from Odisha and Jharkhand? So have you seen any sales happening there? And nothing from Jharkhand? I think you were waiting for some...
We have sold some quantities from Bolani Mines only in Odisha Group of Mines. And going forward, we are planning more sales from Bolani and also in Chhattisgarh going forward because after improving mining over there only, then we'll be able to sell something from Chhattisgarh as well, from Rowghat mines. But presently, we are selling from Bolani, and that will continue. Nothing from Jharkhand because we are still waiting for the permission from the state government, which is not yet available.
The first question is just a bit of sense on the INR686 crores or INR625 crores provision or kind of a one-off from the prior periods that we're talking about. That comes into revenue also, right? Or does it lower your expenditures? The reason I'm asking is if I adjust for it, your NSR kind of fell on a Q-o-Q basis. Maybe I have to adjust for volumes also from NMDC Steel, but on a topline basis, it seems NSR fell if I adjust for these revenues. Is that the right understanding?
Yes. Yes. So let me try to explain this particular number, actually. INR625 is not INR686, minus INR61 crores, it is INR625 crores. And this INR625 crores is coming on the top line, which is the turnover, but it's not a part of the NSR. NSR is not including these areal figures. And so far as prior to Q4 numbers are concerned, because Q4 numbers are INR85 crores, so INR625 crores minus INR85 crores is INR540 crores, which is the figure which is prior to Q4 numbers, which is there in the top line of Q4. No, no, no. It is not to be reduced from the NSR numbers because NSR numbers are rupees per ton, and that doesn't include these area numbers. So the NSR numbers that we discussed sometime back, those remain as it is without getting impacted by this number -- these rupees crores numbers.
Just to take my point on capex. Actually, in starting, you said that you'll be doing about INR7,500 crores of capex, and thereafter, the capex would increase from '27 onwards when your facilities come on stream and you do more capex. Just wanted to get your view on the debt. How is debt going to play out over the next 2 to 3 years?
Yes. Today, the debt is around INR26,800 crores, INR26,700 crores, something like that, and we're planning to reduce it further in this financial year. Last year also we reduced by around INR750 crores. And now we are planning to reduce month-on-month. And going forward, when the capex will be increasing, we'll have 2-pronged approach. Number one, we'll try to increase our profitability. So from internal accruals, we'll be able to compensate a part of the requirement. And the rest part we will line up other instruments available for getting the fund, et cetera. Our debt-to-equity ratio is good enough to take care of these two aspects going forward.
All right. And sir, in your opening remarks, you mentioned that because of some technical parameters, you were able to save close to about INR650-odd crores, which directly had populated down to your bottom line. Just wanted to know that there are possibility to better this going forward or it will -- we can take this number as the standard number going forward.
No, surely, our target is much more than that. Actually, that is what happened last year, while our target was more. And in this year also, again, we are aiming at more figures compared to that number. Much more cost reduction because that is a continuous process actually. And there has been improvement in all these critical parameters over the years, specifically in '24-'25 over '23-'24, there has been a good improvement, and we are looking forward to better improvement in '25-'26. The numbers should be better than this. This is our target.
Sir, my question is with respect to the capacity expansion, which we are targeting up to 35 million tons. So can you break it down, means, by FY '28, do we expect any incremental capacity to come on stream? And if you can further break it down in terms of plans, which capacities will come first? A slightly more detailed answer on that.
I'll try to give you as much as possible, not entirely as you want. But the question is that I have told you actually it's is 35 million tons from current 20 million tons, increase of 15 million tons, includes brownfield as well as greenfield. So in the brownfield, there are debottlenecking efforts as well as setting up of new facilities. These are the 2 things which are happening. And in that process of debottlenecking, by 2028, we are expecting to increase it by maybe around 2 million to 3 million tons, something like that, around 3 million tons, something like that by then because debottlenecking projects will come quickly. And so far as brownfield and greenfield projects are concerned, they take their own timeline of around 3 years, something like that, after they start doing the execution activities. So those will happen subsequently. Now as you said, about the plants, the first plant that we started doing this is ISP, which is IISCO Steel Plant for the brownfield project as well as a bit of -- for the greenfield project as well as a bit of brownfield out there. So in the brownfield, maybe around 0.5 million tons will come in ISP by that '27 or '28. But the entire 7 million tons ultimate capacity will come by 2029. So that is for ISP. And similarly, brownfield and the debottlenecking activities are going on in Durgapur Steel Plant as well as Bhilai Steel Plant as well as Rourkela Steel Plant. So this will also add capacities of 1 million to 1.5 million tons by 2028. But so far as the green field projects are concerned, they are taking shape in these plants. And then all of these are geared up towards giving benefits by 2030.
Just a follow-up on the cost side savings. Is it more driven by the better utilization of plant? We have seen substantial improvement in your techno economic parameters. Just wanted to understand, is it because of better utilization of our plants, and this is going to continue in future also?
Yes, let me answer this question. Let me answer this question. The major steps that we've taken in '24-'25 are that we have stopped some of the inefficient old blast furnaces. Three number of blast furnaces stopped in Bhilai and Rourkela in different, different points of time. And then we increased production from the other bigger blast furnaces. Because bigger blast furnaces, when you increase production, you can concentrate on reducing the -- bettering the techno economic parameters. That is how exactly has happened. And if you see actually, BF productivity on an average for the entire year for SAIL has been more than two in spite of the fact that these 3 blast furnaces are stopped in between. So this year around, the BF productivity is going to go beyond two, there's no doubt about it. And production ramp-up is taking place from other blast furnaces, which are operating -- other larger blast furnaces which are operating. So there, we are getting a bunch of cost reduction over there. And we're targeting -- that is why we're targeting better cost reduction as compared to previous year as well.
Okay. Sir, another thing on the market side, is the spread for long products much better than flat right now? And that's -- how is the outlook for the future? Are our higher share of long product overall is helping us in overall operating performance vis-a-vis peers?
See, what's happening is between LP and FP, although last year, LP was doing good, FP was sublime -- subdued. And after this safeguard duty, et cetera and some international dynamics, there has been a look up in the FP prices, and it is cyclical as well. And as the economy is going to improve right now, as we are expecting, we hope that FP's market is going to improve going forward. And LP also will improve because of the infrastructural sector boom. So both the things should remain good in '25-'26, that is our expectation. See, in case of SAIL, actually, we are making a -- we are maintaining a balance of 50 -- almost 50:50 between LP and FP. So given the cyclicity of any of the side, the other side gives us the benefit.